Exterior
Wednesday, July 27, 2011
Problems
We've run into some problems. When the plumbers were here to hook the appliances up we discovered that the space for the stove/range is too narrow, AND the upper cabinets and vent do not line up with the stove below! This is a huge problem, and we failed the plumbing inspection.
The design company is responsible for the problems so they sent someone out to rearrange the cabinets so they line up with the stove below. Now we are waiting for the counter tops to be fixed, they need to make the space larger for the range to fit, and also repair damage done to the backsplash when the upper cabinets were moved.
We have lost a week from this debacle and there has been lots of communication challenges when trying to get tradesmen to take responsibility for their mistakes.
On a positive note out carpenter is very close to finishing up all of the final touch details and they look great. We are hoping to be 'done' in 2 weeks
Tuesday, July 19, 2011
Countertops
Friday, July 1, 2011
Electrical Final
No pictures for this post, but today the electrical passed final inspection. 2 more inspections left to go; plumbing and building final.
Counter-top template
Subscribe to: